Elastizell EF Permits Higher Levee and Embankment Structures over Poor Soils
elastizell • June 22, 2018

June 22, 2018

The Problem

It is necessary to add a two ramp interchange for an Interstate Highway. At this particular location, a deep fill is required for these ramps over existing reinforced concrete box culverts. Since the proposed ramp fill depth would overload the culvert, what is the most economical method to construct these exit/entrance ramps over the existing box culverts?

The Solution

The existing fill is very deep over the box culvert at the location where it crosses the proposed ramp. Strengthening the box culvert would require sheeting the excavation around the culvert, excavating a great quantity of fill material, demolishing the box culvert, forming and casting a new culvert, and replacing the fill up to the new ramp height including a great deal of compaction.

After a value engineering study, it was determined that the most economical solution would be to conduct a load balancing solution with ELASTIZELL EF. Excavation quantities were determined at the critical sections so that the necessary quantities of ELASTIZELL EF would bring the ramp to the proper grade without overloading the box culvert.

Discussion

The ELASTIZELL EF solution is much less expensive, faster, and more practical than total excavation, demolition, and reconstruction especially on a limited site such as this one with traffic operating on the Interstate. Drainage runoff at this location will not be interrupted since the box culvert will remain in place and operating during ramp construction. Excavation is also kept to a minimum.

Advantages

  • The very light ELASTIZELL EF permits a 4 to 1 ratio of fill depth increase to existing fill removal by load balancing to avoid overloading the box culvert. This minimizes excavation quantities.
  • Keeping the box culvert intact with the ELASTIZELL EF solution permits the continued use of this drainage structure and avoids potential runoff and silt damage if the open cut and demolition solution were selected.
  • The speed of the ELASTIZELL EF solution will result in the ramp being opened sooner than if the open-cut / demolition solution were followed.

Diagram showing a bridge reconstruction.  A corrugated steel culvert supports a new road, replacing an old, deteriorated bridge.
By elastizell July 11, 2018
The Problem A bridge on a federal highway over a small creek has deteriorated to the point where it must be replaced. Among the performers were practically all the rock stars of the 1960s: The Who, Jefferson Airplane, Janis Joplin, Jimi Hendrix, Creedence Clearwater Revival, Joan Baez, Joe Cocker, the Grateful Dead, Ravi Shankar, The […]
Plan view and section view of a silo with sloping bin plates and labeled
By elastizell July 11, 2018
The Problem Storage silos usually require a stable fill material for uniform support behind the sloping hopper plates. If a lightweight fill material is utilized in the original silo design, significant cost savings result. The Solution ELASTIZELL EF is a lightweight and economical material to cast behind the sloping bin plates of silo storage structures. […]
Cross-section diagram of a tunnel with a retaining wall, vehicle access, and surface development.
By elastizell July 11, 2018
The Problem Existing plazas have maximum allowable loads which may preclude landscaping with planters, retaining walls, earth fill, or reflecting pools without exceeding the allowable loading. How can a reflecting pool be re-landscaped without overloading its supportive structure? The Solution ELASTIZELL EF is cast over the waterproofed plaza after the planters and retaining walls have […]
By elastizell July 11, 2018
The Problem Existing retaining walls are often distressed due to greater than anticipated lateral loads from saturated backfills and clogged drainage systems. The Solution An existing distressed retaining wall may be best repaired by removing all or a portion of the existing backfill material, checking the drainage system, and casting ELASTIZELL EF to the proper […]
Ka subscript a
By elastizell June 22, 2018
Many retaining walls fail due to poor drainage of their backfills. Typically, the walls can retain the loads for which they are designed, but water forces can double the design loads and cause failure of the retaining wall. However, these water forces will not build up if adequate drainage is provided. The combination of ELASIZELL […]
By elastizell June 22, 2018
The Problem How can a slip area be repaired and prevent future slippage on an Interstate roadway? Solution A pile and waler system provides the permanent form and lateral restraint for ELASTIZELL EF at the slip area. Discussion Attention must be directed to both the proper anchorage of the pile system and the free water […]
By elastizell June 22, 2018
The Problem A roadway grade must be raised to accommodate a new transit system. A portion of the roadway is over an underground culvert structure unable to carry additional loads. How can the increased elevation be achieved at a minimal cost without overloading the structure? The Solution In order to increase the overall depth of […]
By elastizell June 22, 2018
The Problem What is an economical method for filling tunnel voids, abandoned pipelines, and sliplined pipe annular spaces? The Solution ELASTIZELL EF is an excellent fill material for voids created by various methods of pipeline construction. ELASTIZELL EF is pumped into place to fill the entire void. Discussion ELASTIZELL EF is the most practical solution […]
By elastizell June 21, 2018
The Problem An underlaying layer of peat has prevented the raising of a runway extension by normal construction methods which are to fill and compact. How can a runway extension site be raised through a marshy area? The Solution ELASTIZELL EF concrete stabilized fill will not overload the peat deposit when the runway extension site […]