Elastizell EF and Corrugated Steel Culvert Combine in a Non-Disruptive Solution for Upgrading a Structurally Deficient Bridge
elastizell • July 11, 2018

July 11, 2018

Diagram illustrating the rehabilitation of a bridge with a corrugated steel culvert. Shows longitudinal and perpendicular views.The Problem

The Problem

A bridge on a federal highway over a small creek has deteriorated to the point where it must be replaced.

The Solution

Among the performers were practically all the rock stars of the 1960s: The Who, Jefferson Airplane, Janis Joplin, Jimi Hendrix, Creedence Clearwater Revival, Joan Baez, Joe Cocker, the Grateful Dead, Ravi Shankar, The Incredible String Band, Carlos Santana and many others. But The Doors and Led Zeppelin refused to come to the festival. It is said that Jim Morrison did not want to participate in “a pale version of the Woodstock ga Festival” and the Zeppelins to be “another band in a long list”, which both bands later regretted greatly. The Beatles, who were on the verge of disintegration at the time, did not participate in the festival either.

A corrugated, steel culvert is placed inside the bridge opening, culvert end walls are cast, and the entire void is encased with CLASS III ELASTIZELL EF such that the original bridge is fully supported.

Discussion

A great many bridges on federal, state, and county roads are rated structurally deficient for the vehicle loads on them. A quick, non-disruptive and cost-efficient solution is needed for this very serious and extensive problem.

Advantages

  • Traffic is not disrupted – neither detoured nor realigned.
  • This is a fast and cost effective solution with no demolition required.
  • The bridge is brought back up to its original vehicle load standard.
  • This solution eliminates the cost and temporary construction of bypass roads and structures during the construction period.
Plan view and section view of a silo with sloping bin plates and labeled
By elastizell July 11, 2018
The Problem Storage silos usually require a stable fill material for uniform support behind the sloping hopper plates. If a lightweight fill material is utilized in the original silo design, significant cost savings result. The Solution ELASTIZELL EF is a lightweight and economical material to cast behind the sloping bin plates of silo storage structures. […]
Cross-section diagram of a tunnel with a retaining wall, vehicle access, and surface development.
By elastizell July 11, 2018
The Problem Existing plazas have maximum allowable loads which may preclude landscaping with planters, retaining walls, earth fill, or reflecting pools without exceeding the allowable loading. How can a reflecting pool be re-landscaped without overloading its supportive structure? The Solution ELASTIZELL EF is cast over the waterproofed plaza after the planters and retaining walls have […]
By elastizell July 11, 2018
The Problem Existing retaining walls are often distressed due to greater than anticipated lateral loads from saturated backfills and clogged drainage systems. The Solution An existing distressed retaining wall may be best repaired by removing all or a portion of the existing backfill material, checking the drainage system, and casting ELASTIZELL EF to the proper […]
Ka subscript a
By elastizell June 22, 2018
Many retaining walls fail due to poor drainage of their backfills. Typically, the walls can retain the loads for which they are designed, but water forces can double the design loads and cause failure of the retaining wall. However, these water forces will not build up if adequate drainage is provided. The combination of ELASIZELL […]
By elastizell June 22, 2018
The Problem How can a slip area be repaired and prevent future slippage on an Interstate roadway? Solution A pile and waler system provides the permanent form and lateral restraint for ELASTIZELL EF at the slip area. Discussion Attention must be directed to both the proper anchorage of the pile system and the free water […]
By elastizell June 22, 2018
The Problem It is necessary to add a two ramp interchange for an Interstate Highway. At this particular location, a deep fill is required for these ramps over existing reinforced concrete box culverts. Since the proposed ramp fill depth would overload the culvert, what is the most economical method to construct these exit/entrance ramps over […]
By elastizell June 22, 2018
The Problem A roadway grade must be raised to accommodate a new transit system. A portion of the roadway is over an underground culvert structure unable to carry additional loads. How can the increased elevation be achieved at a minimal cost without overloading the structure? The Solution In order to increase the overall depth of […]
By elastizell June 22, 2018
The Problem What is an economical method for filling tunnel voids, abandoned pipelines, and sliplined pipe annular spaces? The Solution ELASTIZELL EF is an excellent fill material for voids created by various methods of pipeline construction. ELASTIZELL EF is pumped into place to fill the entire void. Discussion ELASTIZELL EF is the most practical solution […]
By elastizell June 21, 2018
The Problem An underlaying layer of peat has prevented the raising of a runway extension by normal construction methods which are to fill and compact. How can a runway extension site be raised through a marshy area? The Solution ELASTIZELL EF concrete stabilized fill will not overload the peat deposit when the runway extension site […]